(Click on pictures for a larger version)
After vine removal before log and shrub removal.

After cleanup

View from trail below. Before               After cleanup
 

   View with sign                   Trail near cliff along top.  I filled in a 3' crevice 
Sign lasted 3 months Aug 20, 2018     to the right of the rock on the left, 
 to end of November.                  so you could go straight across
 It was driven in 10-12 inches         without going around.
 so it didn't blow over.
  
    

    
Looking down - Trail below is just beyond vegetation at the bottom/

Don's Cutover.
A trail I made from Miller Lane toward McBride's rock, so you didn't have to walk down the narrow Vosseller Ave.
I had tried to find a good route, but kept running into barberry stands,
so went out one winter and looked for deer tracks in the snow.
The next spring I cleared some low hanging vines and small fallen trees.
The mountain bikers started using it and now they along with the park service maintain the trail.



last updated 15 May 2018